General Information
Beginning of works: | November 2000 |
---|---|
Completion: | November 2002 |
Duration of works: | 24 months |
Status: | in use |
Project Type
Structure: |
Multiple girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Berlin-Wilmersdorf, Charlottenburg-Wilmersdorf, Berlin, Germany |
---|---|
Address: | Hohenzollerndamm |
Crosses: |
|
Coordinates: | 52° 29' 15.99" N 13° 18' 1.01" E |
Technical Information
Dimensions
span | 28.40 m | |
length | 30.20 m | |
bridge surface | 1 641.0 m² | |
roadway / carriageway width | 2 x 10.00 m | |
walkway width | 2 x 4.35 m | |
cycleway width | 2 x 1.60 m | |
deck | deck depth | ø 1.58 m |
deck width | max. 73.45 m / 75.45 m | |
deck width | min. 41.50 m | |
deck slab thickness | min. 0.25 m | |
girder depth | 0.98 - 1.44 m | |
number of longitudinal girders | 2 x 9 (+ 2 x 7) | |
slenderness | 1/18 |
Quantities
structural steel | 420 t | |
reinforcing steel | 150 t | |
reinforced concrete volume | 6 100 m³ | |
excavated material | 6 400 m³ |
Design Loads
live load | Brückenklasse 60/30 | |
design code(s) | DIN 1072 |
Cost
cost of construction | Euro 8 300 000 |
Materials
deck slab |
reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
girders |
steel
|
end diaphragm |
reinforced concrete
|
Participants
Owner
Client
Original design
Structural engineering
Checking engineering
Contractor
Bearing installation
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2003. Deutscher Bundes-Verlag, Cologne (Germany), 2003, pp. 171-184.