0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: November 2000
Completion: November 2002
Duration of works: 24 months
Status: in use

Project Type

Location

Location: , , ,
Address: Hohenzollerndamm
Crosses:
  • Autobahn A100
Coordinates: 52° 29' 15.99" N    13° 18' 1.01" E
Show coordinates on a map

Technical Information

Dimensions

span 28.40 m
length 30.20 m
bridge surface 1 641.0 m²
roadway / carriageway width 2 x 10.00 m
walkway width 2 x 4.35 m
cycleway width 2 x 1.60 m
deck deck depth ø 1.58 m
deck width max. 73.45 m / 75.45 m
deck width min. 41.50 m
deck slab thickness min. 0.25 m
girder depth 0.98 - 1.44 m
number of longitudinal girders 2 x 9 (+ 2 x 7)
slenderness 1/18

Quantities

structural steel 420 t
reinforcing steel 150 t
reinforced concrete volume 6 100 m³
excavated material 6 400 m³

Design Loads

live load Brückenklasse 60/30
design code(s) DIN 1072

Cost

cost of construction Euro 8 300 000

Materials

deck slab reinforced concrete
abutments reinforced concrete
girders steel
end diaphragm reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20011277
  • Published on:
    03/01/2004
  • Last updated on:
    10/05/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine