General Information
Completion: | 1937 |
---|---|
Status: | in use |
Project Type
Structure: |
Single-span two-tower suspension bridge |
---|---|
Function / usage: |
Road bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Marlborough, New Zealand |
---|---|
Crosses: |
|
Coordinates: | 41° 53' 5.23" S 173° 38' 28.11" E |
Technical Information
Dimensions
main span | 64 m | |
width | 3 m | |
span lengths | 5.2 m - 64 m - 5.2 m | |
number of spans | 3 |
Materials
pylons |
steel
|
---|---|
deck truss |
wood
|
deck flooring |
wood
|
Chronology
1982 | The anchorages are strengthened, the hanger rods are replaced with high-tensile steel hangers and the deck, originally concrete, is rebuilt in laminated timber. |
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridging the Gap. Early Bridges in New Zealand 1830-1939. Reed Books, Auckland (New Zealand), pp. 221-222. (2001):
- About this
data sheet - Structure-ID
20025027 - Published on:
10/11/2006 - Last updated on:
05/02/2016