0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1937
Status: in use

Project Type

Location

Location: ,
Crosses:
  • Hodder River
Coordinates: 41° 53' 5.23" S    173° 38' 28.11" E
Show coordinates on a map

Technical Information

Dimensions

main span 64 m
width 3 m
span lengths 5.2 m - 64 m - 5.2 m
number of spans 3

Materials

pylons steel
deck truss wood
deck flooring wood

Chronology

1982

The anchorages are strengthened, the hanger rods are replaced with high-tensile steel hangers and the deck, originally concrete, is rebuilt in laminated timber.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20025027
  • Published on:
    10/11/2006
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine