Name in local language: | Straßenüberführung Hockeroda |
---|---|
Beginning of works: | 4 November 2019 |
Completion: | 19 November 2021 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
Rigid frame bridge |
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
for registered users |
Location
Location: |
Kaulsdorf, Saalfeld-Rudolstadt, Thuringia, Germany |
---|---|
Coordinates: | 50° 35' 13.28" N 11° 25' 4.11" E |
Technical Information
Dimensions
total length | 54.05 m | |
span | 51.55 m | |
bridge surface | 598 m² | |
number of lanes | 2 | |
crossing angle | 21 gon | |
deck | deck depth | 1.75 - 2.50 m |
deck width | 11.60 m | |
on-center distance between girders | 2.90 m | |
girder depth | 1.40 m | |
number of cells | 2 | |
piles | diameter | 1.20 m |
number | 49 |
Quantities
deck | structural steel | 249 t |
concrete volume | 609 m³ | |
reinforcing steel | 915 t | |
piles | total length of piles | 373 m |
substructure | concrete volume | 3 508 m³ |
reinforcing steel | 470 t |
Design Loads
live load | LM 1 | |
design code(s) | DIN EN 1991-2 + NA |
Cost
cost of construction | Euro 6 700 000 |
Materials
deck slab |
reinforced concrete
(C 35/45)
precast reinforced concrete (C 35/45) |
---|---|
abutments |
reinforced concrete
(C 30/37)
|
cross beams |
steel
|
girders |
steel
(S 355)
|
Participants
Owner
Client
Design
Detailed design
Soil investigation report
Checking engineering
- Ekkehard Fehling (checking engineer)
Co-contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2023. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2023, pp. 7-20.
- About this
data sheet - Structure-ID
20088602 - Published on:
30/05/2024 - Last updated on:
30/05/2024