0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2003
Completion: 17 December 2004
Status: in use

Project Type

Location

Location: , ,
, , ,
Crosses:
  • Rhine River
Coordinates: 47° 33' 42.19" N    8° 4' 28.89" E
Show coordinates on a map

Technical Information

Dimensions

main span 95 m
width 11.2 m
total length 225 m
vertical navigation clearance 7.0 m
horizontal navigation clearance 80 m

Cost

cost of construction Swiss Franc 9 800 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Geotechnical engineering

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20011520
  • Published on:
    05/03/2004
  • Last updated on:
    10/02/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine