0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Hlubočepské South-eastern Viaduct

General Information

Name in local language: Hlubočepské Jihovýchodní Viadukt
Beginning of works: 1870
Completion: 3 July 1872
Status: in use

Project Type

Function / usage: Railroad (railway) bridge
Material: Structurae Plus/Pro - Subscribe Now!
Structure: approach viaducts:
Semi-circular arch bridge
Material: approach viaducts:
Masonry bridge
Structure: main span:
Girder bridge
Material: main span:
Steel bridge

Location

Location: ,
Coordinates: 50° 2' 18.26" N    14° 23' 48.81" E
Show coordinates on a map

Technical Information

Dimensions

length 115 m
height above valley floor or water max. 25 m
number of tracks 1
number of arches 7

Materials

piers masonry
deck of main span steel
arches masonry

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20087525
  • Published on:
    16/02/2024
  • Last updated on:
    16/02/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine