Hisingsbron
-
Walser, Peter / Trojaborg, Steen Savery / Darholm, Thomas / Kollén, Magnus / Stockmann, Rico (2021): Arpeggio – die Hauptbrücke der neuen Hisingsbron in Göteborg. In: Stahlbau, v. 90, n. 10 (October 2021), pp. 731-740.
https://doi.org/10.1002/stab.202100058
-
Ekholm, Kristoffer / Hellgren, Jacob (2019): Construction methods for building the Hisingen Bridge. Presented at: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, pp. 144-148.
https://doi.org/10.2749/newyork.2019.0144
-
Svensson, Isak / Darholm, Thomas / Ekholm, Kristoffer (2019): Live load analysis for the Hisingen Bridge. Presented at: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, pp. 1282-1287.
https://doi.org/10.2749/newyork.2019.1282