Beginning of works: | April 2014 |
---|---|
Completion: | 22 November 2014 |
Duration of works: | 206 days |
Status: | in use |
Project Type
Function / usage: |
Pedestrian bridge (footbridge) |
---|---|
Material: |
Steel bridge |
Structure: |
Single-span two-tower suspension bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 408 m | |
span | 406 m | |
deck width | 1.2 m | |
number of cables | 4 |
Materials
cables |
steel
|
---|---|
deck |
steel
|
pylons |
steel
|
Case Studies and Applied Products
Pedestrian suspension bridge in Reutte, Tyrol, is the world’s longest
Since November 2014, the town of Reutte in Tyrol has a new attraction: highline179. The structure is a 403m long pedestrian suspension bridge that crosses the B 179 Fernpass Road. This structure is registere ... [more]
Excerpt from Wikipedia
Highline179 is located near Reutte on the Bavarian-Austrian Border, it extends at an altitude of 114 meters (374 ft) above the Ehrenburg castle and connects the Ehrenburg ruins with Fort Claudia. The location of the bridge was chosen so that they could build it with a span of 403 meters (1,322 ft).
Construction
The 1.20 m wide pedestrian bridge consists of a grating, which rests on crossbars, which are attached to the four supporting cables with a diameter of 60 mm each by means of vertical hangers. On both sides of the tread a 1.35 m high handrail is mounted, which is connected to the grate through a wire mesh lattice. The supporting ropes are fastened on both sides of the bridge with a total of 16 anchors which extend into the rock to a depth of 17 m. The weight of the bridge is about 70 tons.
One end of the bridge is 9.85 m higher than the other end. The pedestrian path is about 17 m between the two ends, and the sagging can increase by about one meter depending on the load and the temperature. The load bearing capacity is 1000 people, but for safety reasons only 500 people can be on the bridge at the same time, which is ensured by turnstiles at both ends. An entrance fee is charged for the use of the privately financed bridge, which is absorbed by the municipality in case of a minimum use.
History
In the spring of 2012, the planning of the Hängebrücke Ehrenberg was made after the building permit was granted. The goal was the construction of the world's longest rope-hanging bridge, with a length of about 406 meters. The idea came from Maximilian Huttenloher (1952-2009) and was built under architect Armin Walch, who was also involved in the planning of the Hängebrücke Holzgau.
At the beginning of 2013, an investor was found for the project. The market township of Reutte, the European Burmese Museum Ehrenberg and the TVB Nature Park Region of Reutte signed the contract as the basis for the construction and operation of the Hängebrücke.
Start of construction for the highline179 was in April 2014, and at the beginning of May the groundbreaking started. To protect the trunk road to be crossed, a protective scaffold with switchboards was installed over a length of 20 meters.
On October 29, 2014, the bridge was closed nine days after the last cable pull. The opening was scheduled for October 10, 2014 and was postponed to November 22, 2014 as a result of delays.
After a thorough examination, the highline179 was included in the Guinness Book of Records as the "longest pedestrian bridge in the Tibet style". The Guinness World Records Certificate confirmed "The longest Tibet-style footbridge is a catenary-shaped walkway" which brought the distinction to the now opened, approximately 440 m long bridge in the Skypark of Sochi, which is constructed differently with fixed walkways suspended under a tension belt.
Text imported from Wikipedia article "Highline179" and modified on July 23, 2019 according to the CC-BY-SA 4.0 International license.