• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Highland Park Bridge

General Information

Beginning of works: 6 November 1937
Completion: 22 June 1939
Status: in use

Project Type

Structure: Deck truss bridge
Pratt type truss bridge
Support conditions:
Function / usage: Road bridge
Material: Steel bridge
Structurae Plus

Awards and Distinctions

1939 Honorable Mention  

Location

Location: , , ,
, , ,
Crosses:
  • Allegheny River
Coordinates: 40° 29' 19" N    79° 54' 45" W
Show coordinates on a map

Technical Information

Dimensions

total length 738,53 m
main spans 5 × 84.7 m
span lengths 39.6 m - 5 × 84.7 m - 39.6 m
deck width 17,1 m

Cost

cost of construction United States dollar 2 409 126

Materials

piers reinforced concrete
deck truss steel

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20006106
  • Published on:
    11/10/2002
  • Last updated on:
    01/04/2021