General Information
Completion: | 2008 |
---|---|
Status: | in use |
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Composite bridge |
Location
Location: |
Lockport Township, Will County, Illinois, USA |
---|---|
Address: | High Road |
Coordinates: | 41° 37' 33.87" N 88° 2' 46.44" W |
Technical Information
Dimensions
span | 17.4 m | |
deck slab | thickness | 200 mm |
girders | on-center distance between girders | 2.23 m |
girder depth | 1.067 m |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
hybrid-composite beams
|
Participants
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Hybrid helper. In: Bridge Design & Engineering, v. 14, n. 53 (4th Quarter 2008), pp. 42-43.