0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Hetlingen Elbe River Utility Tunnel

General Information

Beginning of works: 2014
Completion: April 2015
Status: in use

Project Type

Structure: Tunnel
Function / usage: Utility tunnel
Construction method: Tunnel boring machine (TBM)

Location

Location: , , ,
, , ,
Underneath of:
  • Elbe River
Coordinates: 53° 36' 8.84" N    9° 36' 26.84" E
Coordinates: 53° 35' 32" N    9° 35' 37.95" E
Show coordinates on a map

Technical Information

Dimensions

diameter 2.400 m
length 1 500 m

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20067775
  • Published on:
    13/09/2015
  • Last updated on:
    13/09/2015
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine