General Information
Project Type
Structure: |
Tunnel with double lining |
---|---|
Function / usage: |
Road tunnel |
Construction method: |
New Austrian Tunnelling Method (NATM) Drilling and blasting |
Location
Location: |
Rheinfelden (Baden), Lörrach (Kreis), Baden-Württemberg, Germany |
---|---|
Part of: | |
Coordinates: | 47° 35' 10.76" N 7° 45' 50.25" E |
Coordinates: | 47° 35' 11.51" N 7° 46' 12.84" E |
Technical Information
Dimensions
number of tubes | 2 | |
crossing tubes | number | 1 |
northern tube | length | 485.00 m |
tunnel section area | 101.00 m² | |
interior width | 10.8 m | |
number of lanes | 2 | |
roadway / carriageway width | 7.50 m | |
southern tube | length | 475.00 m |
tunnel section area | 163.00 m² | |
interior width | 14.3 m | |
number of lanes | 3 | |
roadway / carriageway width | 11.00 m |
Cost
cost of construction | Euro 113 000 000 |
Materials
interior lining |
reinforced concrete
|
---|
Participants
Owner
Client
Object planning
Structural engineering
Co-contractor
Concrete supplier
Relevant Web Sites
- About this
data sheet - Structure-ID
20082064 - Published on:
11/01/2022 - Last updated on:
11/01/2022