Heron Road Workers Memorial Bridge

General Information

Completion: 29 June 1967
Status: in use

Project Type

Function / usage: Road bridge
Structure: Girder bridge
Material: Structurae Plus/Pro - Subscribe Now!

Location

Location: , ,
Coordinates: 45° 22' 32.52" N    75° 42' 3.21" W
Show coordinates on a map

Technical Information

Dimensions

total length ca. 300 m
number of lanes 2 x 3

Materials

piers reinforced concrete
abutments reinforced concrete

Chronology

10 August 1966, 15:27

During the pour of about 2000 tons of concrete for the eastern side of the southern bridge the wooden falsework fails and collapses. Nine workers are killed.

November 1966

In an inquest the cause of the collapse is determined to be faulty design of the falsework which lacked diagonals as well as the use of green instead of matured wood which lacked the necessary bearing capacity. Both the contractor and engineer are given responsibility for the failure.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20040508
  • Published on:
    12/11/2008
  • Last updated on:
    03/12/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine