• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Hermann Liebmann Bridge

General Information

Name in local language: Hermann-Liebmann-Brücke
Beginning of works: 21 November 2001
Completion: 21 August 2004
Status: in use

Project Type

Location

Location: , ,
Coordinates: 51° 20' 59.40" N    12° 24' 21.32" E
Show coordinates on a map

Technical Information

Dimensions

total length 137.60 m
span lengths 28 m -24.6 m - 33 m - 32 m - 20.90 m
longitudinal slope max. 4.5%
deck deck depth 1.38 m
roadway / carriageway width 2 × 10.35 m

Cost

cost of construction ca. Euro 5 800 000

Materials

deck composite steel-prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20013126
  • Date created
    28/08/2004
  • Last Update
    07/11/2017