0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Hermann-Göring-Brücke
Beginning of works: 21 March 1934
Completion: 3 November 1935
Status: destroyed (1945)

Project Type

Structure: Truss bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , , , ,
, , ,
Crosses:
  • Rhine River
Replaced by: Neuwied Bridge (1951)
Coordinates: 50° 25' 14.48" N    7° 27' 31.17" E
Show coordinates on a map

Technical Information

Dimensions

width 8.5 m
total length 686 m
main bridge
length 456.91 m
span lengths 178.75 m - 66.00 m - 212.16 m
number of spans 3

Quantities

structural steel 3 700 t

Materials

truss steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20052776
  • Published on:
    07/02/2010
  • Last updated on:
    28/03/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine