General Information
Name in local language: | Geh- und Radwegbrücke Herbstwiesenweg |
---|---|
Beginning of works: | January 2018 |
Completion: | 2020 |
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Material: |
Steel-reinforced concrete composite bridge |
Structure: |
Tied-arch bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Erlangen, Bavaria, Germany |
---|---|
Crosses: |
A 3 Motorway (Germany) (1984)
|
Coordinates: | 49° 33' 30.42" N 10° 59' 55.31" E |
Technical Information
Dimensions
width | 6.28 m | |
span | 72.00 m | |
length | 72.00 m | |
bridge surface | 453 m² | |
arch | rise | 8.02 m |
deck | deck depth | 0.40 m |
piles | diameter | 1.20 m |
Quantities
structural steel | 274 t | |
concrete volume | 650 m³ | |
reinforcing steel | 128 t | |
piles | total length of piles | 147 m |
Cost
cost of construction | Euro 5 900 000 |
Materials
arches |
steel
|
---|---|
deck slab |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Client
Design
Detailed design
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Chronik des Brückenbaus. Presented at: 30. Dresdner Brückenbausymposium, 8./9. März 2021, Dresden (Germany), pp. 94. (2021):
- About this
data sheet - Structure-ID
20083106 - Published on:
11/06/2022 - Last updated on:
11/06/2022