General Information
Status: | in use |
---|
Project Type
Structure: |
Truss arch bridge |
---|---|
Material: |
Concrete-filled steel tube (CFST) bridge |
Function / usage: |
Road bridge |
Location
Technical Information
Dimensions
arch span | 210 m |
Materials
arch |
concrete-filled steel tubes
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- New developments on Chinese arch bridges techniques. Presented at: ARCH'01. 3ème conférence sur les ponts en arc, pp. 815-820. (2001):
- About this
data sheet - Structure-ID
20006707 - Published on:
09/11/2002 - Last updated on:
04/10/2020