General Information
Completion: | 1936 |
---|---|
Status: | demolished |
Project Type
Structure: |
Tied-arch bridge Vertical lift bridge |
---|---|
Function / usage: |
Railroad (railway) bridge |
Material: |
Steel bridge |
Location
Location: |
Zwolle, Overijssel, Netherlands Hattem, Gelderland, Netherlands |
---|---|
Crosses: |
|
Replaced by: |
Zwolle Railroad Bridge (2011)
|
Coordinates: | 52° 29' 25.36" N 6° 3' 42.37" E |
Technical Information
Dimensions
main span | 73 m | |
width | 10 m | |
total length | 420 m |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20006091 - Published on:
10/10/2002 - Last updated on:
05/07/2017