• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Share

Follow

Hatirjheel Third Bridge

General Information

Official designation: BR-01
Beginning of works: 5 April 2010
Completion: 15 August 2012
Status: in use

Project Type

Structure: Through arch bridge
Function / usage: Road bridge
Material: Reinforced concrete bridge

Location

Location: ,
Coordinates: 23° 45' 39.10" N    90° 24' 32.76" E
Show coordinates on a map

Technical Information

Dimensions

total length 180.00 m
span lengths 19.00 m - 48.50 m - 64.00 m - 48.50 m - 19.00 m
number of spans 5
number of lanes 2 × 2
total width 17.30 m
roadway / carriageway width 13.30 m
walkway width 2 × 2.00 m

Materials

arches reinforced concrete

Advertisement

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20072371
  • Date created
    05/01/2017
  • Last Update
    07/03/2017