General Information
Official designation: | BR-02 |
---|---|
Beginning of works: | 5 April 2010 |
Completion: | 15 August 2012 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Reinforced concrete bridge |
Structure: |
Through arch bridge |
Location
Location: |
Dhaka, Dhaka, Dhaka, Bangladesh |
---|---|
Coordinates: | 23° 46' 4.29" N 90° 24' 46.78" E |
Technical Information
Dimensions
total length | 167.24 m | |
span lengths | 40.50 m - 73.00 m - 53.74 m | |
deck width | 17.30 m | |
number of spans | 3 |
Materials
arches |
reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- Concrete highway arch bridges in Bangladesh: Historical development and lessons learnt. Presented at: IABSE-JSCE Joint Conference on Advances in Bridge Engineering-III, August 21-22, 2015, Dhaka, Bangladesh. (2015):
- About this
data sheet - Structure-ID
20072370 - Published on:
05/01/2017 - Last updated on:
09/06/2017