General Information
Official designation: | Viaduct VD-01 |
---|---|
Beginning of works: | 21 March 2010 |
Completion: | 7 July 2012 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Deck arch bridge |
Material: |
Reinforced concrete bridge |
Location
Location: |
Dhaka, Dhaka, Dhaka, Bangladesh |
---|---|
Coordinates: | 23° 45' 13.78" N 90° 24' 10.49" E |
Technical Information
Dimensions
total length | 100.00 m | |
span lengths | 2 x 50.00 m | |
deck width | 10.90 m | |
number of spans | 2 | |
number of lanes | 2 x 1 | |
roadway / carriageway width | 7.10 m | |
walkway width | 2 x 1.80 m | |
arches | depth | 1.000 - 3.120 m |
Materials
arches |
reinforced concrete
|
---|---|
piers on arch |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- Concrete highway arch bridges in Bangladesh: Historical development and lessons learnt. Presented at: IABSE-JSCE Joint Conference on Advances in Bridge Engineering-III, August 21-22, 2015, Dhaka, Bangladesh. (2015):
- About this
data sheet - Structure-ID
20072372 - Published on:
05/01/2017 - Last updated on:
07/03/2017