General Information
Completion: | 1 September 1891 |
---|---|
Status: | in use |
Project Type
Structure: |
Haunched girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Location
Location: |
Cambridge, Middlesex County, Massachusetts, USA Boston, Suffolk County, Massachusetts, USA |
---|---|
Crosses: |
|
Coordinates: | 42° 21' 16.56" N 71° 5' 28.68" W |
Technical Information
Dimensions
width | 21.13 m | |
total length | 659.82 m |
Materials
girders |
steel
|
---|
Chronology
1988 — 1989 | The entire superstructure is replaced and the substructures are rehabilitated. The original haunched type girder details are used. |
---|
Participants
- William Jackson (chief engineer)
- John E. Cheney (assistant engineer)
Relevant Web Sites
- About this
data sheet - Structure-ID
20008796 - Published on:
23/03/2003 - Last updated on:
02/03/2022