General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Construction method: |
Cut-and-cover method |
Location
Location: |
Geising, Sächsische Schweiz-Osterzgebirge, Saxony, Germany Bad Gottleuba-Berggießhübel, Sächsische Schweiz-Osterzgebirge, Saxony, Germany |
---|---|
For: |
|
Part of: | |
Coordinates: | 50° 47' 7.58" N 13° 53' 41.77" E |
Coordinates: | 50° 47' 15.81" N 13° 53' 33" E |
Technical Information
Dimensions
total length | 300 m | |
clearance | min. 4.80 m | |
longitudinal slope | 0.5 % |
Materials
foundation slab |
reinforced concrete
(B 25)
|
---|---|
wall |
reinforced concrete
(B 35)
|
Participants
Owner
Co-contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20006068 - Published on:
09/10/2002 - Last updated on:
28/05/2021