General Information
Name in local language: | Pont Hans-Wilsdorf |
---|---|
Beginning of works: | 2009 |
Completion: | 30 August 2012 |
Duration of works: | 32 months |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Steel-reinforced concrete composite bridge |
Structure: |
Helical bridge |
Awards and Distinctions
2013 |
for registered users |
---|
Location
Location: |
Geneva, Geneva, Switzerland |
---|---|
Coordinates: | 46° 11' 42.59" N 6° 8' 9.98" E |
Technical Information
Dimensions
width | 15.5 m | |
total length | 85.4 m | |
span | 85 m | |
number of spans | 1 | |
number of lanes | 2 | |
abutments | number | 2 |
Quantities
structural steel | 1 500 t |
Materials
deck slab |
reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Architecture
Structural engineering
Steel construction
Concrete construction
Anti-corrosion protection
Relevant Web Sites
- About this
data sheet - Structure-ID
20062597 - Published on:
01/01/2012 - Last updated on:
05/02/2016