0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1867
Completion: 1869
Status: demolished (1917)

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Missouri River
Replaced by: Hannibal Bridge (1917)
Coordinates: 39° 6' 47.28" N    94° 35' 15.48" W
Show coordinates on a map

Technical Information

Cost

cost of construction ca. United States dollar 1 000 000

Participants

Design

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20030092
  • Published on:
    13/08/2007
  • Last updated on:
    16/05/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine