General Information
Other name(s): | Second Dongting Lake Bridge |
---|---|
Beginning of works: | 2013 |
Completion: | 1 February 2018 |
Status: | in use |
Project Type
Structure: |
Two-span two-tower suspension bridge |
---|---|
Material: |
Steel bridge |
Function / usage: |
Road bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
main span | 1 480 m | |
total length | 2 390.18 m | |
deck | deck width | 35.40 m |
pylons | height | 206 m |
Materials
pylons |
reinforced concrete
|
---|---|
deck truss |
steel
|
anchorages |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2009): China's Major Bridges. Presented at: IABSE Workshop: Recent Major Bridges, Shanghai, China, 11-12 May 2009, pp. 1-24.
- Design of high performance concrete with multiple performance requirements for #2 Dongting Lake Bridge. In: Construction and Building Materials, v. 165 (March 2018), pp. 825-832. (2018):
- Form Finding and Aesthetic Design for Pylons of Cable-supported Bridges. In: Structural Engineering International, v. 31, n. 4 (October 2021), pp. 1-9. (2021):
- About this
data sheet - Structure-ID
20079474 - Published on:
08/06/2020 - Last updated on:
09/06/2020