General Information
Completion: | 1993 |
---|---|
Status: | in use |
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
Precast segmental construction |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Glenwood Canyon, Colorado, USA |
---|---|
Carries: |
|
Crosses: |
|
Part of: | |
Coordinates: | 39° 35' 28.90" N 107° 10' 48.25" W |
Technical Information
Dimensions
total length | 2 569.16 m |
Cost
cost of construction | United States dollar 34 000 000 |
Materials
superstructure |
precast prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|