0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: 한강대교 / 漢江大橋 (Hangang daegyo / Han’gang taekyo)
Completion: 18 September 1929
Status: in use

Project Type

Structure: Tied-arch bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: ,
Crosses:
  • Han River
Coordinates: 37° 31' 3.24" N    126° 57' 31.63" E
Show coordinates on a map

Technical Information

Dimensions

main span 63.55 m
total length 1 005 m
deck deck width 36.8 m

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20006571
  • Published on:
    06/11/2002
  • Last updated on:
    06/06/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine