0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: 八甲田トンネル (Hakkōda tonneru)
Beginning of works: 1999
Completion: 4 December 2010
Status: in use

Project Type

Structure: Tunnel
Function / usage: High-speed rail tunnel

Location

Location: ,
Coordinates: 40° 45' 49.25" N    140° 46' 4.25" E
Coordinates: 40° 44' 41.96" N    141° 6' 22.89" E
Show coordinates on a map

Technical Information

Dimensions

length 26 445 m
number of tracks 2
number of tubes 1

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20064586
  • Published on:
    05/02/2013
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine