General Information
Completion: | 1968 |
---|---|
Status: | in use |
Project Type
Structure: |
Two-span single-pylon cable-stayed bridge |
---|---|
Function / usage: |
Railroad (railway) bridge |
Material: |
Steel bridge |
Structure: |
Two-span cable-stayed bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Untertürkheim, Stuttgart, Baden-Württemberg, Germany |
---|---|
Crosses: |
|
Coordinates: | 48° 46' 32.29" N 9° 14' 53.10" E |
Technical Information
Dimensions
main span | 77.00 m | |
total length | 119.65 m | |
span lengths | 37.492 m - 77.00 m | |
number of cables | 2 | |
number of spans | 2 | |
deck | deck depth | 2.54 - 3.16 m |
deck width | 6.10 m |
Materials
pylon |
reinforced concrete
|
---|---|
deck of main span |
steel
|
deck of approach viaducts |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Ponts haubanées. Presses Polytechniques et Universitaires Romandes, Lausanne (Switzerland), pp. 183-184. (1985):
- Die Stahlkonstruktion der Neckarbrücke Untertürkheim. Eine mit Zugstäben überspannte Eisenbahnbrücke mit Schrägseilsystem. In: Stahlbau, v. 36, n. 2 (February 1967), pp. 33-38. (1967):
- About this
data sheet - Structure-ID
20001087 - Published on:
07/10/2000 - Last updated on:
13/08/2023