General Information
Completion: | 1649 |
---|---|
Status: | in use |
Project Type
Structure: |
Vaulted arch bridge |
---|---|
Material: |
Masonry bridge |
Function / usage: |
Pedestrian bridge (footbridge) |
Location
Location: |
Göschenen, Uri, Switzerland |
---|---|
Coordinates: | 46° 39' 30.45" N 8° 35' 3.68" E |
Technical Information
Materials
arches |
granite
|
---|
Chronology
24 August 1987
— 25 August 1987 |
The bridge is swept away by floods after torrential rainstorms in the area. |
---|---|
1991 | The bridge is rebuilt using the same stone quarry as for the original bridge. |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20006422 - Published on:
18/10/2002 - Last updated on:
28/05/2021