General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Box girder bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Chomutov, Ústí nad Labem Region, Czechia |
---|---|
Coordinates: | 50° 28' 15.68" N 13° 21' 34.03" E |
Technical Information
Dimensions
width | 22.32 m | |
length | 336 m | |
span lengths | 60 m - 2 x 106 m - 60 m | |
number of spans | 4 | |
height above valley floor or water | 62 m | |
deck | deck depth | ca. 2.65 - 6 m |
Quantities
foundations | concrete volume | 4 200 m³ |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- DYWIDAG-Spannsysteme verbinden Tschechien und Deutschland. In: DSI Info, n. 17 ( 2009- 2010), pp. 24.
- About this
data sheet - Structure-ID
20031206 - Published on:
14/03/2008 - Last updated on:
04/07/2018