General Information
Completion: | 2008 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Construction method: |
Balanced cantilever method |
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Location
Technical Information
Dimensions
main span | 165 m | |
total length | 330 m | |
span lengths | 82.5 m - 165 m - 82.5 m | |
number of spans | 3 | |
deck | deck depth | 3.5 - 8.25 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Custom kit. In: Bridge Design & Engineering, v. 14, n. 51 (2nd Quarter 2008), pp. 15.
- Ponte a sbalzo con luce record. In: Strade e Autostrade, v. 12, n. 70 (July 2008), pp. 166. (2008):
- Rekord-Spannweiten mit vorgespannten Beton in der Türkei: Brückenbau mit DSI. In: DSI Info, n. 17 ( 2009- 2010), pp. 40-41.
- About this
data sheet - Structure-ID
20043342 - Published on:
03/02/2009 - Last updated on:
05/02/2016