General Information
Completion: | 2003 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Las Palmas de Gran Canaria, Gran Canaria, Las Palmas, Canary Islands, Spain |
---|---|
Coordinates: | 28° 5' 9.15" N 15° 26' 50.02" W |
Technical Information
Dimensions
main spans | 140 m | |
pier height | max. 100 m | |
deck | deck width | 19 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Design
- Jordi Revoltós (designer)
- José Antonio Llombart (designer)
Structural engineering
Engineering
- Juliana Fernández (engineer)
Co-contractor
Relevant Web Sites
- About this
data sheet - Structure-ID
20008563 - Published on:
11/03/2003 - Last updated on:
21/04/2016