General Information
Name in local language: | Viaduc de Guerville |
---|---|
Beginning of works: | 2016 |
Completion: | 2020 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Construction method: |
Longitudinal launching |
Structure: |
Twin girder bridge |
Material: |
Steel-reinforced concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Guerville, Yvelines (78), Ile-de-France, France |
---|---|
Part of: | |
Next to: |
Guerville Viaduct (1965)
|
Coordinates: | 48° 57' 54.26" N 1° 45' 22.80" E |
Technical Information
Dimensions
total length | 362 m | |
span lengths | 52.0 m - 93.5 m - 116.5 m - 63.0 m - 35.0 m | |
number of spans | 5 |
Quantities
structural steel | 2 600 t | |
concrete volume | 5 000 m³ | |
water proofing | 5 300 m² | |
volume of earthworks | 220 000 m³ |
Materials
piers |
precast reinforced concrete
|
---|---|
main girders |
steel
|
Participants
Owner
Design
Architecture
Co-contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Innovative Developments in Steel and Concrete Composite Plates for Two Recent French Bridges: The Saint Lazare Bridge and the Guerville Viaduct. In: Structural Engineering International, v. 28, n. 2 (April 2018), pp. 136-141. (2018):
- Troisième tablier du viaduc de Guerville. In: Travaux, n. 940 (March 2018), pp. 44-51. (2018):
- About this
data sheet - Structure-ID
20075953 - Published on:
25/09/2018 - Last updated on:
25/09/2018