General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Sibenik, Šibenik-Knin, Croatia |
---|---|
Coordinates: | 43° 52' 3.54" N 15° 48' 46.65" E |
Technical Information
Dimensions
total length | 225 m | |
span lengths | 67 m - 96 m - 62 m | |
number of spans | 3 | |
deck | deck width | 2 x 13.90 m |
pier 1 | height | 35 m |
pier 2 | height | 45 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Main contractor
Prestressing
Form travelers
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridges on the new Motorway from Zagreb to Split employ DSI Know-how. Bridge over the Guduca River, Motorway Zagreb-Split, Croatia. In: DSI Info, n. 14 ( 2006- 2007), pp. 23.
- Brücken mit DSI Know-how für die neue Autobahn von Zagreb nach Split. Brücke über den Fluß Guduca, Autobahn Zagreb-Split, Kroatien. In: DSI Info, n. 14 ( 2006- 2007), pp. 23.
- About this
data sheet - Structure-ID
20034437 - Published on:
13/02/2008 - Last updated on:
18/01/2017