0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2011
Completion: 2011
Duration of works: 10 months
Status: in use

Project Type

Structure: Vaulted arch bridge
Function / usage: Wildlife crossing
Material: Concrete bridge

Location

Location: , , ,
Coordinates: 48° 45' 55" N    10° 12' 28" E
Show coordinates on a map

Technical Information

Dimensions

span 41.305 m
deck width 57.75 - 78.45 m

Quantities

foundations concrete volume 2 200 m³
reinforcing steel 200 t
vault concrete volume 1 542 m³
reinforcing steel 311 t

Cost

cost of construction Euro 2 850 000

Materials

foundations reinforced concrete
arches precast concrete
vault reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20064690
  • Published on:
    06/03/2013
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine