General Information
Name in local language: | Talbrücke Großer Kessel |
---|---|
Beginning of works: | December 2012 |
Completion: | December 2014 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Friedewald, Hersfeld-Rotenburg, Hesse, Germany |
---|---|
Carries: |
A 4 Motorway (Germany)
|
Coordinates: | 50° 53' 17.36" N 9° 50' 25.84" E |
Technical Information
Dimensions
total length | 290.00 m | |
total length | 45 m - 4 x 50 m - 45 m | |
deck width | 33.50 m | |
bridge surface | 9 715 m² | |
deck | girder depth | 3.30 m |
number of lanes | 2 + 3 | |
roadway / carriageway width | 12.25 m + 14.25 m | |
piers P20 | width | 3.40 - 7.00 m |
height | 19.75 m | |
thickness | 2.40 - 3.60 m |
Quantities
substructure | concrete volume | 4 800 m³ |
reinforcing steel | 713 t | |
total length of piles | 1 500 m | |
superstructure | concrete volume | 8 300 m³ |
prestressing steel | 337 t | |
reinforcing steel | 1 770 t |
Design Loads
design code(s) | EC1-2/NA |
Cost
cost of construction | Euro 13 200 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Soil investigation report
Checking engineering
- Manfred Abel (checking engineer)
Contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2017. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2017, pp. 97-110.
- About this
data sheet - Structure-ID
20074774 - Published on:
16/02/2018 - Last updated on:
16/02/2018