0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Tunnel Großer Busch
Beginning of works: 1989
Completion: 1990
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: Cut-and-cover method

Location

Location: , ,
Part of:
Coordinates: 51° 15' 35.23" N    7° 5' 7.55" E
Coordinates: 51° 15' 43.77" N    7° 5' 3.30" E
Show coordinates on a map

Technical Information

Dimensions

length 275 m
number of lanes 2 x 2
number of tubes 2

Cost

cost of construction German Mark 22 000 000

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20086778
  • Published on:
    03/09/2023
  • Last updated on:
    03/09/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine