0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Gronda di Genova
Beginning of works: 2018
Status: project phase

Project Type

Location

km Name

Technical Information

Dimensions

total length 49 km
number of tunnels 25

Notes

New motorway connection between the A10, A7 and A12 in Genova.

The project will include the following tunnels:

  • Monterosso Tunnel (6106-6060 m)
  • Amandola Tunnel (5938-5926 m)
  • Voltri Tunnel (205-203 m)
  • Borgonuovo Tunnel (2092-2021 m)
  • Ciocia Tunnel (383 m)
  • Bric del Carmo Tunnel (825 m)
  • Delle Grazie Tunnel (1242 m)
  • Moro 1 Tunnel (826 m)
  • Moro 2 Tunnel (769 m)
  • Polcevera Tunnel (494 m)
  • San Rocco Tunnel (1266 m)
  • Bric du Vento Tunnel (2454 m)
  • Torbella Tunnel (350-111 m)
  • Granarolo Tunnel (3304 m)
  • Baccan Tunnel (1510 m)
  • Forte Diamante Tunnel (2789 m)
  • Forte Begato Tunnel (1386 m)
  • Campursone Tunnel (104 m)
  • Monte Sperone Tunnel (1920 m)
  • Morego Tunnel (93 m)

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    10062537
  • Published on:
    10/12/2011
  • Last updated on:
    22/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine