0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2009
Completion: 12 December 2015
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: New Austrian Tunnelling Method (NATM)

Location

Location: , ,
, ,
Coordinates: 48° 22' 15.10" N    14° 28' 44.60" E
Coordinates: 48° 24' 31.60" N    14° 29' 0.21" E
Show coordinates on a map

Technical Information

Dimensions

eastern tube width 11 m
total length 4 432.5 m
number of lanes 3
total excavated section ca. 115 m²
western tube width 7.50 m
total length 4 454 m
number of lanes 2
total excavated section ca. 86.50 m²

Case Studies and Applied Products

Construction of Goetschka and Freistadt Tunnels

Construction of Goetschka and Freistadt Tunnels

In 2009, construction began on the S10 Muehlviertel Highway in Upper Austria. The new S10 highway connects to the existing Muehlkreis A7 Motorway north of Linz near Unterweitersdorf and extends to the former border crossing near Wullowit ... [more]

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20066304
  • Published on:
    30/07/2014
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine