General Information
Beginning of works: | 1998 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Technical Information
Dimensions
Northern bridge | ||
---|---|---|
span lengths | 84.1 m - 87.6 m | |
number of spans | 2 | |
Southern bridge | ||
span lengths | 58.4 m - 66.4 m - 82.3 m | |
number of spans | 3 |
Materials
deck |
precast prestressed concrete
|
---|
Participants
Construction engineers
Construction
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20004482 - Published on:
15/08/2002 - Last updated on:
30/03/2017