General Information
Project Type
Function / usage: |
Flood-control dam |
---|---|
Structure: |
Mobile barrage |
Location
Location: |
Givet, Ardennes (08), Grand-Est, France |
---|---|
Coordinates: | 50° 8' 42.59" N 4° 49' 56.66" E |
Technical Information
Dimensions
total length | 136 m |
Cost
cost of construction (incl. taxes) | ca. Euro 13 341 000 |
Participants
Impact studies
Topographic studies
Owner
Client
Architecture
- AEI - Architecture Environnement Infrastructures
- Rodrigue de Peñaranda de Franchimont (architect)
- Pierre Loyer (architect)
Environmental engineering
Construction engineers
Geotechnical engineering
Checking engineering
Main contractor
Civil works
Subcontractor
Electricity
Construction supervision
Project development
Hydraulic consultant
Specialist consultants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20032340 - Published on:
18/10/2007 - Last updated on:
08/01/2015