0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 7 March 2022
Completion: 10 June 2022
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Rusine river.
Coordinates: 1° 46' 6.31" S    30° 3' 47.66" E
Show coordinates on a map

Technical Information

Dimensions

span 88 m

Materials

cables steel wire
deck steel
pylons steel
anchorages reinforced concrete

Notes

The bridge built by Bridges to Prosperity serves around 6898 people in the communities of Gisiza-Gatobotobo - Kamatongo.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084635
  • Published on:
    25/01/2023
  • Last updated on:
    27/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine