General Information
Name in local language: | Viaduc du Giffre |
---|---|
Completion: | 2018 |
Duration of works: | 36 months |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Single-cell box girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Construction method: |
Longitudinal launching |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Marignier, Haute-Savoie (74), Auvergne-Rhône-Alpes, France |
---|---|
Coordinates: | 46° 4' 19.98" N 6° 29' 21.64" E |
Technical Information
Dimensions
total length | 302.40 m | |
span lengths | 55.50 m - 3 x 63.00 m - 55.50 m | |
number of spans | 5 | |
deck | deck width | 12.54 m |
girder depth | 2.00 m | |
total width | 14.54 m | |
piers | height | 8.37 m |
Quantities
deck | structural steel | 1 000 t |
concrete volume | 1 200 m³ | |
reinforcing steel | 330 t | |
substructure | concrete volume | 2 700 m³ |
reinforcing steel | 260 t | |
submerged concrete volume | 1 500 m³ |
Cost
cost of construction | Euro 11 600 000 |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Architecture
Structural design
Construction engineers
- Briva (steel)
- COGECI Bureau d'études de génie civil (concrete)
Main contractor
Civil works
Steel construction
Special foundations
Earthworks
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Viaduc de franchissement du Giffre à Marignier (74). In: Travaux, n. 940 (March 2018), pp. 28-35. (2018):
- About this
data sheet - Structure-ID
20075951 - Published on:
25/09/2018 - Last updated on:
15/10/2019