General Information
Completion: | 1893 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Structure: |
main bridge: Deck truss bridge |
Material: |
main bridge: Metal bridge |
Structure: |
main bridge: Pratt type truss bridge approach viaducts: Vaulted arch bridge |
Material: |
approach viaducts: Masonry bridge |
Location
Location: |
Gien, Loiret (45), Centre-Val de Loire, France Poilly-lez-Gien, Loiret (45), Centre-Val de Loire, France |
---|---|
Coordinates: | 47° 41' 16.29" N 2° 36' 51.81" E |
Technical Information
Dimensions
width | 7 m | |
total length | 1 832.20 m | |
northern approach viaduct | total length | 273 m |
southern approach viaduct | total length | 1 198.20 m |
main bridge | ||
---|---|---|
total length | 361 m | |
number of spans | 7 |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Le Patrimoine de la SNCF et des chemins de fer français (2 Tomes). Flohic Editions, Paris (France), pp. 121. (1999):
- About this
data sheet - Structure-ID
20037183 - Published on:
18/05/2008 - Last updated on:
05/02/2016