General Information
Name in local language: | Oderbrücke Gieboldehausen-Herzberg |
---|---|
Beginning of works: | 13 June 2022 |
Completion: | 16 December 2022 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Rigid frame bridge |
Material: |
Steel-reinforced concrete composite bridge |
Support conditions: |
for registered users |
Construction method: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Herzberg am Harz, Osterode am Harz (Kreis), Lower Saxony, Germany Hattorf am Harz, Osterode am Harz (Kreis), Lower Saxony, Germany |
---|---|
Crosses: |
|
Coordinates: | 51° 37' 39.42" N 10° 16' 18.55" E |
Technical Information
Dimensions
span | 30.00 m | |
number of spans | 1 | |
bridge surface | 567 m² | |
number of lanes | 2 | |
roadway / carriageway width | 8.00 m | |
deck | deck width | 13.30 m |
on-center distance between girders | 7.70 m | |
girder depth | 1.15 - 2.279 m | |
girder width | 1.20 m | |
superelevation | 2.50 % | |
deck slab | length | 42.66 m |
deck slab thickness | 0.35 m | |
piles | diameter | 1.20 m |
number | 2 x 6 |
Quantities
deck | structural steel | 44 t |
concrete volume | 260 m³ | |
reinforcing steel | 45 t | |
substructure | concrete volume | 566 m³ |
reinforcing steel | 98 t |
Design Loads
live load | LM 1 | |
design code(s) | DIN EN 1991-2 + NA |
Materials
deck slab |
precast prestressed concrete
(C 60/75)
|
---|---|
abutments |
reinforced concrete
|
girders |
steel
(S 355)
|
Participants
Owner
Client
Design
Structural engineering
Architectural consulting
Checking engineering
- Karsten Geißler (checking engineer)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2023. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2023, pp. 83-98.
- About this
data sheet - Structure-ID
20088615 - Published on:
31/05/2024 - Last updated on:
31/05/2024