General Information
Completion: | 2005 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Bandar-e Anzali, Gilan, Iran |
---|---|
Next to: |
Ghazian Bridge
|
Location description: |
Over Ghazian Creek of Caspian Sea |
Coordinates: | 37° 27' 55.50" N 49° 28' 5.31" E |
Technical Information
Dimensions
span lengths | 25 m - 76.5 m - 125 m - 50 m | |
number of spans | 4 |
Materials
deck |
prestressed concrete
|
---|
Participants
Design
Relevant Web Sites
- About this
data sheet - Structure-ID
20033071 - Published on:
05/11/2007 - Last updated on:
26/11/2021