General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Two-span continuous girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Tobadill, Tyrol, Austria |
---|---|
Crosses: |
|
Replaces: |
Gfäll Bridge (1972)
|
Connects to: |
Gfäll Tunnel (2007)
|
Coordinates: | 47° 6' 48.37" N 10° 29' 28.11" E |
Technical Information
Dimensions
number of spans | 2 | |
piers | number | 1 |
Materials
deck |
prestressed concrete
|
---|---|
abutments |
reinforced concrete
|
pier |
reinforced concrete
|
Participants
Structural engineering
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20041912 - Published on:
01/01/2009 - Last updated on:
05/02/2016