General Information

Beginning of works: March 1999
Completion: July 2002
Status: in use

Project Type

Location

Location: , , , ,
Carries:
  • Bundesstrasse B 31n
Crosses:
  • Gauchach
Coordinates: 47° 53' 35.19" N    8° 25' 9.64" E
Show coordinates on a map

Technical Information

Dimensions

main span 100 m
total length 791.00 m
span lengths 50.00 m - 80.00 m - 4 x 100.00 m - 85.00 m - 75.00 m - 60.00 m
number of spans 10
bridge surface 9 097 m²
deck deck depth 3.00 - 5.50 m
deck width 11.50 m

Quantities

structural steel 2 550 t
deck structural steel 2 682 t
concrete volume 903 m³
concrete volume 3 234 m³
reinforcing steel 98 t
reinforcing steel 566 t
substructure concrete volume 1 426 m³
concrete volume 3 669 m³
reinforcing steel 552 t

Cost

cost of construction Euro 16 800 000

Materials

superstructure composite steel-reinforced concrete
piers reinforced concrete

Chronology

March 1999

Beginning of construction.

July 2002

Completion.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001356
  • Published on:
    11/03/2001
  • Last updated on:
    15/04/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine