0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1 July 2015
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Mwange river.
Coordinates: 1° 45' 56.40" S    30° 7' 35.96" E
Show coordinates on a map

Technical Information

Dimensions

span 51 m

Materials

cables steel wire
pylons steel
anchorages reinforced concrete
deck flooring eucalypt hardwood

Notes

The bridge built by Bridges to Prosperity serves around 4300 people.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084960
  • Published on:
    24/01/2023
  • Last updated on:
    27/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine